Construction Engineering project

We are confident that we have the best essaywriters in the market. We have a team of experienced writers who are familiar with all types of essays, and we are always willing to help you with any questions or problems you might face. Plus, our writers are always available online so you can always get the help you need no matter where you are in the world.


Order a Similar Paper Order a Different Paper

Attachment is MY FRIEND SAMPLE FROM LAST SEMSTER

Save your time - order a paper!

Get your paper written from scratch within the tight deadline. Our service is a reliable solution to all your troubles. Place an order on any task and we will take care of it. You won’t have to worry about the quality and deadlines

Order Paper Now

Your assignment is to prepare a mock fee proposal based on the following information: An owner of a 3 acre parcel of land has contacted your firm to provide a fee proposal to design a 25,000 square foot, 6-story office building (structure only) and all associated site work (grading, drainage, parking, civil utilities, etc….site electrical design is not required). The surface parking area will accommodate parking for 250 vehicles. Storm water retention on site will be required and an existing sanitary main runs adjacent to the site.

Include the following in your proposal:

-Scope of Work to be performed by your firm. (Note: The scope should be full design to meet the Owner’s requirements including structural and site design. Your firm will also provide geotechnical work, surveying, and a Phase I environmental survey) No architectural, mechanical, electrical, or any other design will be required. The owner will be contracting for this work separately.

-Estimated Lump Sum Fee to complete the design ready for bidding. (Note: This will require you to estimate the number of hours for each labor classification to complete the design). Likely labor items will include: Senior Engineer, Civil Engineer, Structural Engineer, Draftsman, Clerical, Surveyor, etc. Geotechnical work should include the cost of the drill rig. Provide backup for the lump sum total. In other words, show the number of hours, unit cost and total cost for each labor classification line item.

-A unit price listing of hourly rates for various positions in your firm. (Note: These rates will be used to negotiate any additional work should changes arise during design) Be sure to use a fully marked-up rate for each classification to cover overhead expenses for your firm.

Please contact me if you have any question

Writerbay.net

Do you have a lot of essay writing to do? Do you feel like you’re struggling to find the right way to go about it? If so, then you might want to consider getting help from a professional essay writer. Click one of the buttons below.


Order a Similar Paper Order a Different Paper